- Version
- Download 8
- File Size 142.21 KB
- File Count 1
- Create Date July 6, 2023
- Last Updated July 6, 2023
Detailed mechanical and electrical design of the prototype
Aeris is responsible for the design and construction of BIOGASNET prototype in collaboration with UCA and UPC.
The BIOGASNET prototype will be implemented in two different facilities with different biogas sources in order to validate the proposed technology and to demonstrate its robustness under different conditions. Firstly, the prototype will be installed and operated at the Miramundo‐Los Hardales landfill located in Cádiz (Spain) and then will be moved to a Municipal solid waste management plant (MSWTP) in Athens (Greece). The prototype consists in two main equipment: a nitrification bioreactor that will be fed by landfill leachate (Cádiz scenario) and an anoxic biotrickling filter that will be fed by the effluent for the nitrification bioreactor and the biogas from the landfill wells. To be implemented in Athens scenario, the prototype will be expanded with a scrubber to carry out the absorption of the ammonium in water and this water will be used to feed the nitrification bioreactor. The current document contains the design tasks of the activities of Action B1 (Design, Construction and Installation of the Prototype). Hence, it provides the technical description and design methodology carried out to develop the process units that comprises the protype that will be implemented in Cadiz and Athens.